Launch of the smart meters testing in several facilities prior to installing them in many buildings and properties. He revealed that the testing period of these meters will last for three months and the situation will be evaluated before issuing a tender for importing large number of the meters. Al-Hajri explained that these meters will provide consumers with the option of using either the prepaid system or the normal postpaid system. The prepaid system will allow the consumers to make prior payments for the quantity of electricity they require. He added that the installation of these meters will provide the sector with accurate information annually about the load and dues.
Source : Arabtimes


Leave a Reply to Kiruba Karan Cancel reply