If you live in or near Jleeb Al-Shuyoukh, or you own property there, youโll want to pay attention right now. Kuwait Municipality has moved from warnings to action, and bulldozers are already working through a list of buildings marked for demolition.
This follows the order we covered in our earlier report on the Jleeb Al-Shuyoukh demolition order from 4 October, when 263 buildings were first listed as violating construction and planning rules. That list is now being cleared on the ground.
- Kuwait Municipality has started demolishing 263 properties in Jleeb Al-Shuyoukh found to break building regulations.
- These 263 are part of a bigger plan covering 757 properties in total, split into batches.
- A second batch of 494 properties is due for demolition in about three weeks, once the Municipalityโs Director General signs off.
- A third batch is still waiting on technical reports and detailed lists from the Ministry of Public Works.
So what exactly is happening?
The Municipality is running what officials call a phased enforcement campaign. Instead of tearing down every flagged building at once, itโs working through the list in stages, starting with buildings that already have approved demolition orders.
The first batch, 263 properties, is being demolished now. The second batch, 494 properties, has already been approved by the Municipalityโs Director General and is set to go ahead in roughly three weeks. Together, these two batches make up the 757 properties targeted so far.
A third batch exists too, but itโs not ready yet. The Municipality is still waiting on technical reports and detailed property lists from the Ministry of Public Works before it can move forward with that group.
Who pays for the demolition?
This is the part property owners in the area really need to know. The Municipality has made clear that owners of violating buildings, not the state, will cover the full cost of demolition and removing the debris.
These charges arenโt a flat fee. Officials said the cost is worked out case by case, based on things like:
- The transport routes needed to bring in equipment and remove waste
- The type and amount of equipment required for the job
- The buildingโs height, meaning its number of floors
- The total built-up area of the property
In short, a taller or larger violating building will likely cost its owner more to pull down than a small one. Officials said regulations will be enforced firmly, with no exceptions mentioned for owners who disagree with the assessed cost.
What this means if you live or own property in Jleeb Al-Shuyoukh
For tenants and residents, this campaign could mean changes nearby: construction noise, dust, closed access roads, or buildings youโve known for years coming down. If you rent in a building thatโs on one of these lists, itโs worth checking with your landlord or the Municipality directly rather than waiting for a surprise notice.
For owners, the message is blunt. If your building is confirmed as violating, youโre expected to pay for its demolition yourself, and the bill depends on the buildingโs size and location, not a fixed rate. It would be sensible to ask the Municipality early for an estimate rather than waiting until the crew arrives.
Jleeb Al-Shuyoukh has been under close watch from authorities for a while now. Our earlier coverage of a case in the same area showed itโs an area where enforcement has picked up on several fronts recently, not just construction violations.
Quick answers
How many buildings are being demolished right now?
263 properties are currently being demolished, out of 757 flagged across the first two batches.
When will the next batch of demolitions start?
The second batch of 494 properties is expected to start in about three weeks, after final approval from the Municipalityโs Director General.
Is there a third batch coming?
Yes, but it isnโt scheduled yet. The Municipality is waiting for technical reports and property lists from the Ministry of Public Works before it can proceed.
Who pays for the demolition work?
Property owners pay the full cost, calculated based on the buildingโs size, height, equipment needs and access routes.
If your building, or one near you, is on this list, donโt wait for the crew to show up. Reach out to Kuwait Municipality now and get ahead of it. You can also follow our latest local news in Kuwait as the second and third batches are confirmed.
๐ Related stories
Latest News
International
315 people are missing
2
Local Kuwait minister warns firms over late salaries to expats
Read more โ
3
Local Indian expat held in Kuwait over maid-hiring fraud scam
Read more โ
4
Local Kuwait sets KD 200 fee to appeal medical liability
Read more โ
5
International US Orders Non-Emergency Staff to Leave Saudi Arabia
Read more โ
6
Local Transfer your money in seconds
Read more โ
7
International worldโs first 24-carat gold walking path.
Read more โ
8
International What the New US Travel Advisory for Saudi Arabia and UAE
Read more โ
9
International What Trumpโs latest Iran strike warning mean.
Read more โ
10
Local Fake Germany job offer costs Hawally woman KD 1,000
Read more โ
11
Local 8,849 Kuwait firms flagged over late salary payments
Read more โ
12
International Russia in talks with Kuwait on visa-free travel deal
Read more โ
13
International USA Loaded missiles on warships against Iran
Read more โ
14
Local Jazeera Airways surprises passengers with mid-air orchestra show
Read more โ
15
International 5 new K-dramas Kuwait is streaming now: from Make Me Tingle to Doctor X
Read more โ


Leave a Reply