5MW power plant technology benchmark in Kuwait
Leading CIS thin-film producer Solar Frontier is building a 5MW power plant with TSK in Kuwait as part of a benchmarking project with c-Si technology for the Kuwait Institute for Scientific Research (KISR).
Solar Frontier said that it would start shipping its CIS modules for the project at the beginning of December and expected the plant to be operational from June 2016 onwards. TSK would be responsible for the construction and operation of the site for the next six years.
The PV power plant is part of the Shagaya Renewable Energy Project and run as part of the Innovative Renewable Energy Research program at KISR, which is testing the performance of multiple renewable technologies, including PV, concentrated solar power (CSP) and wind. TSK is building and operating all the solar related plants.
Wolfgang Lange, Managing Director of Solar Frontier Europe said, “CIS modules are particularly well-suited for tough conditions such as in the desert in Kuwait. One of the reasons is because CIS modules are less affected by high temperatures, as indicated by their lower temperature coefficient.”
Source : PV Tech
Kuwait News
- Events in Kuwait
- Polish Girl arrested in Kuwait
- Two girls and 5 boys arrested in Salmiya
- Filipino raped for twice
- Expats medical tests
- Woman caught in camera while stealing bag
- Pakistani husband deported wife trying to get pardon
- Mobile theft caught in Camera in Fahaheel
- 15 Arrested in raid
- Tracking Bracelet will be given to pilgrims from Kuwait
- Orangutan caught in Kuwait in Narcotic Influence
- Kuwait’s Own Satellite
- Apply online Visa for Kuwait
- Rules and Regulations of E-Visa for Kuwait
- Kuwait Hottest Day
- Lady arrested at KSA Airport
- Three days off on weekend due to heat
- Visa for Parents
- 40 Expats Arrested
- 6000 Bottles of Alcohol caught in Kuwait
- Kabab of dead sheep in Restaurant in Kuwait
