5MW power plant technology benchmark in Kuwait
Leading CIS thin-film producer Solar Frontier is building a 5MW power plant with TSK in Kuwait as part of a benchmarking project with c-Si technology for the Kuwait Institute for Scientific Research (KISR).
Solar Frontier said that it would start shipping its CIS modules for the project at the beginning of December and expected the plant to be operational from June 2016 onwards. TSK would be responsible for the construction and operation of the site for the next six years.
The PV power plant is part of the Shagaya Renewable Energy Project and run as part of the Innovative Renewable Energy Research program at KISR, which is testing the performance of multiple renewable technologies, including PV, concentrated solar power (CSP) and wind. TSK is building and operating all the solar related plants.
Wolfgang Lange, Managing Director of Solar Frontier Europe said, “CIS modules are particularly well-suited for tough conditions such as in the desert in Kuwait. One of the reasons is because CIS modules are less affected by high temperatures, as indicated by their lower temperature coefficient.”
Source : PV Tech
Kuwait News
- Events in Kuwait
- Visa selling for KD 2,300
- Spread of ‘Strawberry’ pills in schools
- Help desk for Filipinos in Kuwait
- Three expatriate women were arrested
- Death video clip
- Arrested two Asians
- 29,710 expats cancel work permits
- Teddy bear arrested 🙂
- Ban lifted on Indian Maids
- 3 arrested in Gym
- Transfer from visit visa to family visa
- Women on maternity leave is also allowed to take annual leave
- Taxi Driver Arrested
- Disable person arrested for breaking the social media accounts
- 58 individuals stopped at Kuwait Airport
- Project visa release
- Indian gang was making 70000 KD per month, arrested
- 3,608 cases of faking disability uncovered
- Zain Kuwait hits 70Gbps speed in 5G
- Maid in Love
